In 2016 MSE Precast Ltd. was awarded the precast for the San Josef Bridge for the Ministry Of Transportation and Infrastructure by the Sims Group.  During an extreme flood event in 2013 the original bridge was washed out due to high water levels and an accumulation of river debris.

CLIENT:

Sims Group

DATE:

2016

SERVICES:

Supply and Installation of MSE Wall and CIP Abutments

The replacement Bridge is a 31m single lane, single span structure located on Winter Harbour road, near Holeberg, BC.  MSE Precast was contracted to do the sub-structure work, including the installation of AIL MSE wall panels for retaining the bridge abutments and casting the bridge bearing caps on site in preparation for the prestressed box girders.