This project consisted of two towers that were constructed with fourteen very large stackable blocks.  The towers are being used in the mining industry to support a 2.5 km conveyor belt system that gives the owner the ability to move and restack the tower to wherever the conveyor is needed.  The finished towers are 20′ long by 20′ wide and 20′ tall.  Each precast component weighed over 58,000 lbs with the largest element weighing in at 98,000 lbs.  This successful project was cast and delivered over a 6 week timeframe that allowed our customer to build the new conveyor system with minimal downtime.

Services

/

Project details
  • Client: Pacer Corporation
  • Date: January 2014